WQMP / Stormwater Pollution Prevention

Print

National Pollution Discharge Elimination Systems (NPDES)

Unlike the sewer system, which carries wastewater from your home to treatment plants, the storm drain system in Chino releases untreated water into flood control channels, creeks, and rivers. Anything that gets thrown, swept or poured into the street, gutter or a catch basin will lead into our local waterways. This includes paints, fertilizers, pesticides, motor oil, pet waste, trash, sewage, pool filter media, construction waste, sediment, degreasers and chemicals. Storm water pollution from urban runoff is a public health risk and an environmental threat to the quality of our local waterways. To report illegal dumping into the City of Chino’s streets or storm drains and to report clogged storm drains, please call the Chino Police Department at (909) 334-3000 during business hours and (909) 628-1234 all other hours.

On January 10, 2010 the Santa Ana Regional Water Quality Control Board (SARWQCB) adopted Order No. R8-2010-0036 . This order renewed the National Pollution Discharge Elimination System (NPDES) Municipal Storm Water Permit for San Bernardino County.

Water Quality Management Plans (WQMPs)

The WQMP is intended to provide information related to the project’s generation and mitigation of water quality pollutants and assessment of hydrological impacts. The WQMP contains project information related to site characteristics, expected pollutants, and hydrology impacts. It describes the incorporation of Low Impact Development (LID) Preventative measures as well as LID Mitigative Measures listed here in order of priority: (1) infiltration Best Management Practices (BMPs); (2) BMPs that harvest and use runoff; and (3) vegetated BMPs that promote evotranspiration. The collective information is intended to describe how the project will minimize water quality impacts to downstream water bodies.
The City implements a comprehensive project review and approval process to ensure that proposed projects comply with the MS4 Permit and local ordinance requirements. All priority projects are required to submit a Preliminary WQMP for review by the Public Works Water and Environmental Engineering Department. Projects classified as Non-Priority per the WQMP Technical Guidance document (TGD) must consult with the city staff to discuss WQMP submittal requirements and selection of LID Preventative Measures.

The Preliminary WQMP shall be submitted during the Development Review Committee (DRC) process and must;

-Include completed form 1-1
-Include completed forms 2.1-1, 2.3-1 and 2.4-1
-Include completed forms 3-1 and 3-2
-Include complete narratives as described in section 4.1.2 of the WQMP Template
 and Form 4.1-3 Preventative LID Site Design Practices Checklist
-Include all calculations and forms as required in section 4.2 Project Performance Criteria
 of the WQMP Template (Forms 4.2-3 through 4.2-5 may be replaced by computer
 software analysis based on the San Bernardino County Hydrology Manual)
-Include all calculations and forms as required in section 4.3 Project Conformance
 Analysis of the WQMP Template
-Include a site plan showing LID Preventative Measures, structural BMPs, on-site
 conveyance and discharge points
-Include Engineering studies/reports that justify any infeasibility determination
 (e.g. soils report explaining the infeasibility of infiltration BMPs)
-Be approved during the DRC process prior to the scheduling of a public hearing before
 the City Planning Commission or City Council.

The San Bernardino County Water Quality Management Plan (WQMP) Technical Guidance Document and Template for New Development and Redevelopment Projects can be downloaded by clicking on the following links.

Complete WQMP Technical Guidance Document (TGD) with Appendices (.pdf)
http://www.sbcounty.gov/dpw/land/pdf/WQMP/SantaAna-WQMP-Final-June-2013.pdf

WQMP Template (editable) - FINAL (For Submittal Purposes) (.doc)
http://www.sbcounty.gov/dpw/land/pdf/WQMP/AppendixB-WQMPTemplate(editable).doc

Additional Local Reference - City of Chino Local Implementation Plan (LIP)
Local Implementation Plan

After the Preliminary WQMP has been approved, a complete Final WQMP must be submitted to the City for approval. Any additional sections of the WQMP template that were not included in the Preliminary WQMP submittal and any related engineering studies must be included with this submittal.

Once the Final WQMP is approved it will be used as a guide for the maintenance of the BMPs. A hard copy of the Final WQMP must remain onsite with the current owner/tenant in perpetuity as it will serve as an enforceable document. Section 8 of the TGD describes in detail the requirements for the post-construction BMP Requirements.

Figure 2-1 from the TGD illustrates the WQMP process. 
WQMP Development Process Flowchart

Additional Resources
Please click the following links for additional information on storm water pollution prevention. More references and links are provided in the WQMP TGD.

http://www.sbcounty.gov/dpw/land/npdes.asp

http://www.waterboards.ca.gov/rwqcb8/water_issues/programs/stormwater/san_bernardino_permit.shtml

http://www.cabmphandbooks.com/